April 15, 2020
808
Riigimetsa Majandamise Keskus
“Reconstruction of Rumbi roads and bridge in June 2019”
We assembled and delivered the steel pipe bridge MP200 3.43mx2.30m; binoculars 15 + 15m
“Reconstruction of Rumbi roads and bridge in June 2019”
We assembled and delivered the steel pipe bridge MP200 3.43mx2.30m; binoculars 15 + 15m
© 2024 Geopipes | RZ